IEC 61850 substation automation, SCADA with live single line diagrams and telemetry to the control centre, for distribution and plant substations.

How substation automation is layered

Switchgear and transformers at process level, protection relays and bay controllers at bay level, and SCADA, HMI and the control centre gateway at station level, all tied together by an IEC 61850 station bus. Follow the numbers from the top: the control centre sees only what the gateway reports, the operators work at station level, and every measurement starts at the primary equipment at the bottom.

Substation automation architecture1Control centreoutside the substation2Station levelwhere people operatethe substation3Station busIEC 61850 Ethernetjoins every device4Bay levelone panel per bay:relay, controller, meter5Process levelthe primary equipmentDISCOM / SLDCcontrol centreThe utility's control room. It does not see the bays,only what the gateway reports.IEC 60870-5-104 / 101 telemetrySCADA server A / Bhot standbyhistorian, trends, reportsOperator HMIlive single line diagram,alarms, sequence of eventsControl centre gatewayIEC 60870-5-104 / 101to DISCOM / SLDCGPS clocktime sync for everyrelay and serverswitchswitchMMS: measurements, statusand events reported to SCADAGOOSE: fast interlockingmessages between bays33 kV incomer bayI1Protection relayBay controllerEnergy meterTransformer bayT1Protection relayBay controllerEnergy meter11 kV feeder bayF3Protection relayBay controllerEnergy meter11 kV feeder bayF4Protection relayBay controllerEnergy meter33 kV incomingCTbreakerPT33 / 11 kV transformer11 kV busbarfeeder F3feeder F4CTs, PTs, breaker status andtrip commands are hardwiredto the bay panelsPrimary circuitHardwired copper (CT, PT, trip)IEC 61850 EthernetTelemetry WAN (IEC 104)Simplified for clarity.

Read it top to bottom: the control centre only talks to the gateway, operators work at station level, every bay has its own panel, and each panel is wired to the equipment directly below it.

What happens when a feeder trips

  1. 1Fault on feeder F3The CT sees the overcurrent and the protection relay trips the breaker in about 40 ms, over hardwiring.
  2. 2Other bays interlockThe relay publishes a GOOSE message so the other bays interlock, and reports the trip over MMS with a 1 ms time stamp from the GPS clock.
  3. 3Operator sees itThe operator HMI turns F3 red on the single line diagram, raises the alarm and logs the sequence of events.
  4. 4Control centre informedThe gateway forwards the trip and the feeder current to the DISCOM / SLDC control centre over IEC 104.
  5. 5Restored and recordedAfter the fault is cleared the operator closes the breaker from the HMI. Every action is in the audit log and the outage duration goes into the report.

What each layer gives you

Process levelmeasurements and switching
Bay levelprotection, control and metering per bay
Station levelone screen for the whole substation
Control centrethe network sees your substation

What we deliver in power and substations

Common questions

Which voltage levels do you work at?

Distribution and plant substations, including those inside water supply schemes and process plants. Send us the single line diagram and we will size the scope.

Can the substation report to a utility control centre or SLDC?

Yes, through a gateway over IEC 60870-5-104 or 101.